Back to all guides
Infrastructure

Future development near QUE101

Pune's eastern corridor is getting new transport links, including a metro extension and double-decker flyovers on Nagar Road.

Bharatmata Road, Dhanori, conceptual image
Bharatmata Road, Dhanori, conceptual image. Images are indicative.

Timelines can change. Check official MahaMetro announcements for the latest status.

Why infrastructure matters

When you buy into a pre-launch project, you are buying into how the area will feel in a few years, not just today. For QUE101, also known as Life 360 Dhanori, the most important changes are on Pune's eastern corridor, along Nagar Road towards Viman Nagar, Kharadi and Wagholi.

Metro and roads

Metro Line 2B from Ramwadi to Wagholi/Vitthalwadi, with 11 stations, is approved, and preparatory work near Ramwadi began in September 2026. The extension is planned as a double-decker structure, with a six-lane elevated road running beneath the metro viaduct, which is intended to ease traffic on Nagar Road as well as add rail capacity.

Further out, Line 4 (Khadakwasla–Hadapsar–Kharadi) is approved and under survey, and an airport connector line is being studied. If these go ahead, east Pune would be better linked to the rest of the city than it is today.

How to read these plans

Large infrastructure projects often take longer than first announced, and routes can change. Treat them as a possible upside rather than a certainty, and base your decision on what the area already offers.

Check official MahaMetro and Pune Municipal Corporation announcements for the latest status, and confirm the distance from the site to any proposed station before you factor it in.

What it could mean for residents

If the eastern corridor projects arrive as planned, the biggest change for Dhanori residents would be easier travel towards Viman Nagar, Kharadi and Wagholi, and an alternative to driving on Nagar Road at peak hours. The double-decker design is meant to add road capacity at the same time as the metro, rather than one after the other.

Better transport links also tend to bring more shops, services and offices to an area over time, which adds to everyday convenience.

Living through the construction years

Large projects take time, and the years of construction can mean diversions and slower traffic on affected roads. Most of the planned work is along Nagar Road rather than in Dhanori itself, but trips in that direction may take longer while it is under way.

For buyers at QUE101, possession and these transport projects are likely to overlap in some way, so plan your daily routes with that in mind and keep an eye on official updates.

In short

The main changes planned near QUE101 are on Nagar Road: the approved Line 2B metro extension with a six-lane elevated road beneath it, plus Line 4 and an airport connector under study. These could make east Pune easier to travel across over the coming years. Treat them as a possible bonus rather than a certainty, base your decision on what Dhanori already offers, and follow official announcements for timelines.

Frequently asked questions

Is a metro station coming to Dhanori?

The approved Line 2B stations are on the Nagar Road side, not in Dhanori itself. Check the exact distance from the site to the nearest planned station.

When will Line 2B open?

Preparatory work began in September 2026. Opening dates depend on construction progress, so follow official MahaMetro updates.

What is the double-decker flyover?

Line 2B is planned with a six-lane elevated road beneath the metro viaduct along Nagar Road.

Will construction affect traffic near Dhanori?

Most planned work is along Nagar Road, so trips in that direction may be slower during construction. Check official updates for diversions.

See QUE101 for yourself

12 acres in Dhanori, with homes from ₹90 L. The EOI window is open for pre-launch pricing.